School & College
Visa Versa HomeWedding EntertainmentWedding CinematographySchool & College Dance PartyPrivate & Corporate EventsCommercial Video ProductionContact Us
Space & Power Requirements

We can try to work with less than ideal conditions, but to setup this system as advertised the following requirements must be met.

  • The venue must be large, such as a gymnasium.  The minimum ceiling height is 14'.  The entire system spans 50' across and needs 22' of unused space for video projection.  See the diagram below.

  • The system requires a minimum of 5 separate power circuits, accessible within 50' of the setup.

  • Clearance for use of water based fog.  If clearance can't be given we won't use the fogger.  The lighting effects are dramatically reduced without fog.

  • Three hours of setup time prior to your event is required for setup.  Tear down takes between 60 and 90 minutes.  No assistance from school workers is required.

  • If your event is located over two hours from Syracuse, NY or ends later than midnight lodging must be provided.

Video Dance Setup Diagram
 
 
Video Gallery
Testimonials
DJ Packages
Video Dance Party
Prom & Ball DVDs
Outdoor Movies
Get in Touch
Video Dance Party
 

Site SectionsWedding DJWedding VideoSchool & CollegeCorporate PartiesVideo ServicesContact

School & College PagesGalleryTestimonialsDJ PackagesVideo DanceProm DVDsOutdoor Movies

Copyright 2007 Visa Versa Entertainment